Pressure relief door with double leaves is a device for releasing explosive pressure. The leaf be made up of two steel explosion resistant windows. The steel explosion resistant windows can be opened automatically When the explosive pressure reaches 10Kpa~20Kpa.After exploding, the windows can be closed and it can be used after simple treatment.
Application:
Ideals for industrial sites with dust explosions and gas explosions.
Working principle:
The Pressure relief door and the steel explosion resistant windows are all open to the outside.
The explosion pressure strength be controlled by explosion resistant bolt.The explosion resistant bolt be made up of bolt, Aluminum alloy gasket and Waterproof gasket.
The explosion pressure causes the aluminum alloy gasket to deform, and then the steel windows can be automatically opened under the impact of the explosive airflow to achieve the purpose of releasing explosive pressure.
Model number | DIAN-BD1702 |
Panel color | Customized |
Anti-explosion ability | 190Kpa(3mm)/260Kpa(5mm) |
Release pressure ability | 10Kpa≤pressure≤0.3 Mpa |
Open style | Manual, Swing |
Steel windows | Explosion-proof steel windows |
Application | Army, coal mine ,power station, etc. |
Surface treatment | Powder-coat |
Lock option | Industrial lock system |
Panic | Heavy duty steel panic |
Seal | Rubber sealing strip |
Dimensions | |
Door size | High:2100mm-2700mm;Wide:800mm-1800mm |
Steel plate Thickness | 3mm / 5mm |
Panel thickness | Standard 60mm (customizable) |
Weight | 90~135kg/㎡ |
Material | |
Door leaf material: | 3mm/5mm Carbon steel panel on both side |
Skeleton material: | 50 * 50 * 5/3 mm square skeleton, skeleton small grid area is not more than 0.3 square meters. |
Door frame material: | 50 * 100 * 5/3 mm rectangular tube production, set the installation hole and hinge welding parts to strengthen the production of anti-riot edge and buffer seal |
Filler | rock wool (mineral wool) |
Packing & Delivery | |
Packing | Plastic Protection Foam between each sections. Wooden case or carton packing |
Delivery time | 15~30 days after receive the deposit |
MOQ | 1 set |